Glass Animals

by FOH Staff
in Showtime
The band and Little Dragon played Red Rocks July 26.
The band and Little Dragon played Red Rocks July 26.

Sound Cos
Brown Note Productions, Special Event Services

Venue
Red Rocks Amphitheatre
Morrison, CO

Crew

  • FOH Engineer: Pete Johnson
  • Monitor Engineer: Simon Lutkin
  • A1 Systems Tech: Mick Sturgeon
  • A2: Mark Leeper
  • A3: Dave DiaGiacomo
  • BNP Account Rep: Ryan Knutson
  • Production Manager: Simon Lutkin
  • Tour Manager: Tom Allen


Gear

FOH System

  • Consoles: DiGiCo SD10 (SES), Avid Venue Profile w/CPU 5DSP & stage rack (BNP)
  • Speakers: Main: L-Acoustics K1 (16), K2 (16); K1-SB subwoofers (12, flown), KS28 subwoofers (12, ground-stacked). Fills: Kara (6), ARCS II (6), all provided by BNP
  • Amps: L-Acoustics LA-RAK II (8); LA12 amplified controller rack (3) provided by BNP
  • Processing: Lake LM44, Waves SoundGrid Server One
  • Drive Rack/Work Box: BNP Touring drive rack, Lenovo tablet
  • Stage Drive: CPC/Shout System
  • Drive Snake: d&b audiotechnik EtherCON drive snake (300’)
  • FOH Snake: Gepco 5-Wire Digital Snake (300’)
  • Rigging: CM 2-ton motors (4), 1-ton motors (4), from BNP


MON System

  • Consoles: Avid Venue Profile w/CPU 5DSP & stage rack (BNP)
  • Speakers: d&b audiotechnik M4’s (10), d&b Q7 (1), Q-Subs (2). Side fills: d&b V7P (4), V-Sub (4); (BNP)
  • Mic Splitters/Fanouts: Ramtech 54 ch. 3-way split; Ram F to XLR M fanouts; Ram 25’ (BNP)
  • Mics: Microphone & DI kit (BNP)
  • Power Distro: Motion Labs (SES)